Perri Putra. (2025). Pengendalian Waktu Pekerjaan Konstruksi Pembangunan RSUD Dr. Sobirin Kabupaten Musi Rawas: Analysis of Time Control for Construction Work for the Construction of Dr. RSUD. Sobirin, Musi Rawas Regency. LITERA: Jurnal Ilmiah Mutidisiplin, 2(1), 154–168. Retrieved from https://litera-academica.com/ojs/litera/article/view/131